These pages show the progress each month during the second year of the project

Month 14: Arrival of 12 volt electrical parts, new steering wheel, rack & pinion, and brake hoses, prepping of engine parts for assembly and beginning of stainless steel roof trim restoration.

Month 18: Assembly of Engine, power train, rear suspension, and brakes, with installation in the car and beginning of the body work, starting with the engine compartment.

Month 20: Giving the seats to the upholsterer. Cutting, fabricating and replacing rusted body panels, including side panels of the box frame.

Month 21: Repair of the floor, replacing rusty panels from donor steel.

Basic Blue theme by ThemeFlood