Month 36

These pages show the progress in the fifth 12 months of the project

Month 51: The installation of the headliner, LED brake lights, with discovery and diagnosis of the transmission problem.

Month 54: Installation of the new forward clutch pack, reassembly of the power pack into the frame and truck, testing and determination of additional problems. Removal of the engine and separation from the transmission, further diagnosis, reassembly and success.

Month 57: Final touches, wheel alignment, fabrication of new license plate & bracket. Finished pictures.
Basic Blue theme by ThemeFlood